
PI - 100 HOT AIR SYSTEM
CONTROLLER
HEATER HEAD


1 Contents
- Heater Head Assembly.
- Controller Assembly.
2 Installation
- Place the system on a sturdy level surface.
- Connect the heater head to the controller.
- Connect the power cord to the controller.
- Connect the compressed clean, dry air supply to the controller.
​
3 Controls and Features
​

4 System Settings
4.1 Temperature
4.1.1 Depress and hold the up or down arrow key of the temperature controller to scroll
to the desired temperature. After 2 seconds the new value will be accepted and the
temperature will ramp to the new set points.
4.2 Hot Air Flow
4.2.1 Rotate the flow meter knob until the meter indicates the desired flow rate.
5 System Operation.
5.1 Switch SYSTEM POWER on.
5.2 Set heated air flow to 10 - 100 SCFM.
5.3 Switch HEAT on.
5.3.1 When the temperature is not within +/-3° of the set point the error
message “TEMPERATURE ERROR” will be displayed.
5.4 Position components to be processed within the thermal nozzle for a timed duration.
5.5 Remove the components from the thermal nozzle and position them at the end of the
cooling air nozzle. Depress the foot switch and toggle the panel switch “COOLING AIR”
to start the flow of air.
5.6 Allow heater head to cool to 245°F before shutdown.
6 System Specifications.
Description Range Resolution Accuracy
6.1 Temperature 250-750°F 1.0° +/-.25%F.S.
6.2 Air Flow 5-100 SCFM 5.0 SCFM +/-6% F.S.
8 Facilities Requirements.
8.1 Voltage: 108-132 VAC, 50/60 Hz.
8.2 Wattage: 500 W max.
8.3 Compressed air: 80-100psi, 0.5 CFM, filtered, oil and water free.
​
*Please contact us for pricing and availability*
